References

Selected projects

Since VIA was founded in 2024, directly or together with partner engineering firms. Projects are presented anonymously.

2026ManufacturingBelgium

Optimising the heating of a production hall

Assignment
Complete replacement of the room fan control system, supervision of the upgrade works and commissioning.
2026Flat glassFor an engineering firm

Cooling water and energy recovery

Assignment
Functional analysis of the open and closed cooling loops of a float line and its utilities, with heat recovery for building heating.
2026Steel industryStudy

Optimising a station of 9 lifting pumps

Assignment
Operating study and optimisation of the control of the whole pump set.
2025Pharmaceuticals · ATEXCaribbean · for a Belgian client

Revamping study of a granulator in an ATEX zone

Assignment
Site survey, electrical, instrumentation, pneumatics, ATEX requirements, PLC/HMI functional analysis, cost estimate and schedule.
2024–2025Fire safetyBelgium

Revamping of a fire extinguisher filling machine

Assignment
End-to-end project: electrical and pneumatic replacement, new PLC + HMI control system, programming, site supervision and commissioning.
2024–2025Flat glassCzech Republic

Patterned glass line: assistance and training

Assignment
Technical assistance and training of local teams to secure the process and build up skills.
2024Flat glassIndia

Start-up of a float glass line

Assignment
Commissioning assistance in Rajasthan and operator training.
2024Energy · gasBangladesh · remote

Remote improvement of PLC programs

Assignment
Remote interventions on gas sites: analysis, modification and optimisation of PLC programs, testing and commissioning with local teams.
2024Energy · gas storageBelgium

Improvement of PLC programs

Assignment
Changes to strengthen safety, reliability and process operation on a highly demanding site.
BuildingPLC · HMI · WebVIA project

Complete supervision of a boiler room and the energy of a home

Context
Gas boiler, two heating circuits, hot water cylinder, photovoltaics and heat pump controlled by a Siemens S7-1215 PLC and a WinCC Unified panel.
Assignment
Programming of the control functions (heating curves, schedules, overrides, hot water management with solar priority), HMI screens and web supervision hosted on a local server: animated overviews, trends, daily energy balances, costs under fixed, variable and quarter-hourly dynamic contracts.
Result
An installation that can be operated from PC and smartphone, with secure login, per-user rights and traceability of every setpoint change.

Your project could be next

Let's talk about your installation and your constraints.

Contact us →